• EN
  • Solutions
    • Fire protection curtains

      Fire protection curtains

      In case of fire, fire protection curtains close wall and ceiling openings. Their construction (roll-down or folding technique) and the use of different fabrics provide for a wide range of applications as well as different protection goals, classifications and time classes. The casing and guide rails of the highly flexible systems blend almost invisibly into the building and allow plenty of scope for sophisticated architecture and open room concepts.

    • Conveyor system closures

      Conveyor system closures

      Various production and logistics processes call for the most diverse types of conveyor systems. If these conveyor lines pass through fire-retardant or fire-resistant walls or ceilings, the openings required for this purpose must be provided with fire protection closures to prevent the spread of fire through the conveyor system or the goods conveyed. In the event of fire, conveyor system closures (CSC for short) must close these openings immediately and automatically. Fire resistance classified according to DIN EN 13501-2 is just as important as the smooth clearance of the closing areas in the event of a fire.

    • Smoke curtains

      Smoke curtains

      A smoke apron is a part of a smoke control system which also includes other components such as natural smoke and heat exhaust ventilators (EN 12101-2) and mechanical smoke and heat exhaust ventilators (EN 12101-3). Smoke aprons restrict the movement of combustion gases within a building in case of fire.

    • Smoke protection curtains

      Smoke protection curtains

      Once closed, smoke protection curtains (SPC) restrict the passage of smoke during the phase of fire formation, so that in the event of a fire, there is enough time to rescue people and animals from the room behind the curtain and to recover material assets without the need for respiratory equipment.

    • Tube sealings

      Tube sealings

      The solution for issues with fire protection dampers in ventilation and air conditioning systems in conveyor processes. Stöbich offers fire protection for pneumatic conveyor lines the closing elements of which are not exposed to the flow of conveyed material. This way, the closing element cannot be damaged or contaminated by abrasive conveyed goods.

    • Control units

      Control units

      Each automatic fire protection system needs a control unit. They are critical to safety, because a failure of this function means that the entire investment into a fire protection sealing has been in vain. Control units coordinate both fire detection and interaction with other control units, such as higher-level building control systems or clearing of the closing area of conveyor system closures.

  • Theme worlds
  • News
  • Contact
  • STÖBICH Brandschutz: Austria Contact
Swissbau 2024

Good atmosphere at Swissbau 2024

Good atmosphere at Swissbau 2024

In mid-January, the multi-industry trade fair in Basel once again became a popular meeting place for the Swiss construction and property industry. Visitor and exhibitor numbers confirm the high frequency.

52,486 visitors came to the halls of Messe Basel from 16 to 19 January 2024 to find out about innovations and trend topics relating to construction. The colourful mix of knowledge transfer, discussions and trying out solutions was very well received by the public.
On a total of 85,000 square metres, 615 exhibitors presented their latest products and technologies. Our Swiss partner ➥ JOMOS was also on site with its fire protection portfolio and reported a positive response. The focus was on the thermally insulating ➥Fibershield®-I fire protection curtain from STÖBICH, which attracted many interested glances. The JOMOS team answered questions and gave detailed insights into the many possible applications of the textile fire protection curtain.

The next Swissbau will take place from 20 to 23 January 2026 in Basel.

Picture credits: © MCH Group AG

  • Swissbau 2024
  • Swissbau 2024
  • Swissbau 2024
  • Swissbau 2024
  • Swissbau 2024
  • Swissbau 2024
  • Swissbau 2024
  • Swissbau 2024
  • Swissbau 2024
  • Swissbau 2024
  • Swissbau 2024
  • Swissbau 2024
  • Swissbau 2024
  • Swissbau 2024